Introduction | p. 9 |
Creating a schedule | p. 11 |
Schedule elements | p. 11 |
Forms of representation | p. 14 |
Depth of representation | p. 18 |
Creating a framework schedule | p. 23 |
The structure of the project schedule | p. 24 |
Planning task sequence | p. 29 |
Planning task duration | p. 37 |
Workflows in the planning and construction process | p. 41 |
Planning participants | p. 41 |
Coordinating planning | p. 44 |
Coordinating construction preparation | p. 45 |
Preparing the construction process | p. 47 |
Building shell | p. 49 |
Building envelope | p. 50 |
Finishing work | p. 51 |
Building services | p. 59 |
Final work | p. 63 |
Working with a schedule | p. 65 |
Updating and adjusting a schedule | p. 65 |
Disruptions to the construction process | p. 67 |
Dealing with disruptions | p. 71 |
Scheduling as process documentation | p. 73 |
In conclusion | p. 75 |
Appendix | p. 76 |
Literature | p. 76 |
Information required for planning | p. 77 |
Unit production times | p. 79 |
Table of Contents provided by Blackwell. All Rights Reserved. |
The New copy of this book will include any supplemental materials advertised. Please check the title of the book to determine if it should include any access cards, study guides, lab manuals, CDs, etc.
The Used, Rental and eBook copies of this book are not guaranteed to include any supplemental materials. Typically, only the book itself is included. This is true even if the title states it includes any access cards, study guides, lab manuals, CDs, etc.