did-you-know? rent-now

Amazon no longer offers textbook rentals. We do!

did-you-know? rent-now

Amazon no longer offers textbook rentals. We do!

We're the #1 textbook rental company. Let us show you why.

9780833044075

Increasing Aircraft Carrier Forward Presence Changing the Length of the Maintenance Cycle

by ; ; ;
  • ISBN13:

    9780833044075

  • ISBN10:

    0833044079

  • Format: Paperback
  • Copyright: 2008-04-01
  • Publisher: RAND Corporation
  • Purchase Benefits
List Price: $23.00
We're Sorry.
No Options Available at This Time.

Summary

The U.S. Navy1s aircraft carrier fleet must meet the forward presence requirements of theater commanders. With a decreasing fleet size, planners must balance the timing of maintenance, training, and deployment with presence and surge demands. Evaluating multiple one- and two-deployment scenarios per cycle, RAND examines the feasibility of different cycle lengths, their effect on carrier forward presence, and their impact on shipyard workloads.

Table of Contents

Figures
Tables
Introductionp. 1
Past, Current, and Potential Carrier Cyclesp. 5
The Impact of Different Cycles on Operational Availabilityp. 21
The Impact of Different Cycles on the Maintenance Industrial Basep. 31
Findings and Recommendationsp. 49
Workload Graphs for the Norfolk and Puget Sound Naval Shipyardsp. 55
Bibliographyp. 67
Table of Contents provided by Blackwell. All Rights Reserved.

Supplemental Materials

What is included with this book?

The New copy of this book will include any supplemental materials advertised. Please check the title of the book to determine if it should include any access cards, study guides, lab manuals, CDs, etc.

The Used, Rental and eBook copies of this book are not guaranteed to include any supplemental materials. Typically, only the book itself is included. This is true even if the title states it includes any access cards, study guides, lab manuals, CDs, etc.

Rewards Program