did-you-know? rent-now

Amazon no longer offers textbook rentals. We do!

did-you-know? rent-now

Amazon no longer offers textbook rentals. We do!

We're the #1 textbook rental company. Let us show you why.

9780876296530

Square Foot & Assemblies Estimating Methods

by
  • ISBN13:

    9780876296530

  • ISBN10:

    0876296533

  • Edition: 3rd
  • Format: Hardcover
  • Copyright: 2001-12-01
  • Publisher: R s Means Co
  • Purchase Benefits
  • Free Shipping Icon Free Shipping On Orders Over $35!
    Your order must be $35 or more to qualify for free economy shipping. Bulk sales, PO's, Marketplace items, eBooks and apparel do not qualify for this offer.
  • eCampus.com Logo Get Rewarded for Ordering Your Textbooks! Enroll Now
List Price: $69.95

Summary

Develop accurate and verifiable estimates with a minimal investment of time.

The Third Edition features:
-- Time-saving techniques for producing reliable conceptual estimates.
-- A step-by-step demonstration of building elements selection and its cost impact on the total budget.
-- Guidance for using the Means database for reliable feasibility studies and early project planning, including an overview of Means CostWorks square foot and assemblies estimating software.

Updated and revised to the UNIFORMAT II classification system.

Table of Contents

Contributors to This Edition ix
Introduction xi
How to Use This Book xiii
Types of Estimates
1(14)
Four Types of Estimates
1(13)
Time and Cost of Estimating
14(1)
Square Foot and Cubic Foot Estimates
15(12)
Using Square Foot/Cubic Foot Cost Data
15(1)
Some Examples
16(9)
Conclusion
25(2)
Developing Structural Loads
27(20)
Developing Loads
27(1)
Assembly Versatility
28(1)
Soil Bearing Capacity
28(1)
Load Requirements
29(8)
Conclusion
37(4)
Assemblies Estimate: Three-Story Office Building
41(6)
Substructure
47(34)
Spread Footings
47(2)
Concrete Piers
49(1)
Strip Footings
49(3)
Grade Beams
52(5)
Piles, Pile Caps, and Caissons
57(12)
Slab on Grade
69(2)
Assemblies Estimate: Three-Story Office Building
71(10)
Superstructure
81(22)
Elevated Floor Assemblies
81(5)
Considerations in Selecting Foundation and Framing Systems
86(3)
Small versus Large Concrete Building
89(6)
Assemblies Estimate: Three-Story Office Building
95(8)
Exterior Closure
103(20)
The Effects of Energy Requirements
103(5)
Exterior Wall Systems
108(4)
Assemblies Estimate: Three-Story Office Building
112(11)
Roofing
123(14)
Selecting a Roof Assembly
123(4)
Calculation of Roof Area
127(1)
Flashing
127(2)
Roof Deck Insulation
129(1)
Conclusion
129(1)
Assemblies Estimate: Three-Story Office Building
130(7)
Interiors
137(24)
Partitions
137(3)
Stairs
140(1)
Wall and Floor Finishes
140(5)
Assemblies Estimate: Three-Story Office Building
145(16)
Conveying Systems
161(12)
Selecting and Estimating Elevators
161(3)
Safety
164(1)
Speed and Capacity
164(1)
Traffic
165(1)
Sizing Elevators
166(2)
Freight Elevators
168(1)
Service Elevators
169(1)
Federal Requirements
169(1)
Cost of Elevators
169(1)
Assemblies Estimate: Three-Story Office Building
170(3)
Plumbing
173(22)
Estimating Plumbing Systems
173(9)
Assemblies Estimate: Three-Story Office Building
182(13)
Heating, Ventilation, and Air Conditioning
195(16)
Heating
196(1)
Air Conditioning
197(1)
Quality and Complexity
198(7)
Assemblies Estimate: Three-Story Office Building
205(6)
Fire Protection
211(14)
Classes of Fires
212(1)
Standpipes
212(1)
Sprinkler Systems
213(1)
Occupancy Hazards
214(1)
Assemblies Estimate: Three-Story Office Building
214(11)
Electrical
225(20)
Budget Square Foot Costs
225(4)
Estimating Procedure
229(4)
Assemblies Estimate: Three-Story Office Building
233(12)
Equipment, Furnishings, and Special Construction
245(4)
Equipment and Furnishings
245(1)
Special Construction
246(1)
Assemblies Estimate: Three-Story Office Building
246(3)
Building Sitework
249(14)
Site Preparation
249(1)
Site Improvements
249(1)
Site Mechanical and Electrical Utilities
249(1)
Earthwork
249(1)
Utilities
250(1)
Pavements
250(5)
Assemblies Estimate: Three-Story Office Building
255(8)
Estimate Summary
263(12)
The Installing Contractor's Overhead and Profit
263(2)
General Contractor's Mark-ups
265(5)
Assemblies Estimate: Three-Story Office Building
270(1)
Completed Estimate Summary
271(4)
Overview/Estimate Analysis
275(12)
Breakdown of Square Foot Costs
275(1)
Cost Comparisons
275(3)
Component Comparison
278(3)
Estimating Accuracy
281(1)
Estimate Summary
281(2)
A Final Word
283(4)
Appendix 287(50)
Using UNIFORMATT II in Preliminary Design & Planning
287(10)
UNIFORMAT II Levels 3 and 4
297(28)
Overview of CostWorks
325(12)
Index 337

Supplemental Materials

What is included with this book?

The New copy of this book will include any supplemental materials advertised. Please check the title of the book to determine if it should include any access cards, study guides, lab manuals, CDs, etc.

The Used, Rental and eBook copies of this book are not guaranteed to include any supplemental materials. Typically, only the book itself is included. This is true even if the title states it includes any access cards, study guides, lab manuals, CDs, etc.

Rewards Program