did-you-know? rent-now

Amazon no longer offers textbook rentals. We do!

did-you-know? rent-now

Amazon no longer offers textbook rentals. We do!

We're the #1 textbook rental company. Let us show you why.

9780833041616

Sustaining U.S. Nuclear Submarine Design Capabilities, Executive Summary

by ; ; ; ;
  • ISBN13:

    9780833041616

  • ISBN10:

    0833041614

  • Format: Paperback
  • Copyright: 2007-05-19
  • Publisher: RAND Corporation
  • Purchase Benefits
  • Free Shipping Icon Free Shipping On Orders Over $35!
    Your order must be $35 or more to qualify for free economy shipping. Bulk sales, PO's, Marketplace items, eBooks and apparel do not qualify for this offer.
  • eCampus.com Logo Get Rewarded for Ordering Your Textbooks! Enroll Now
List Price: $20.00

Summary

Nuclear submarine design resources at the shipyards, their suppliers, and the Navy may erode for lack of demand. Analysis of alternative workforce and workload management options suggests that the U.S. Navy should stretch out the design of the next submarine class and start it early or sustain design resources above the current demand, so that the next class may be designed on time, on budget, and with low risk.

Table of Contents

Introductionp. 1
What Should Be Done About the Current Gap Between Submarine Design Efforts?p. 1
Motivators of New Submarine Design Have Evolvedp. 2
Framing the Shipyard Analysisp. 5
Step 1: Predict Design Demandp. 5
Step 2: Formulate Supply Optionsp. 6
Step 3: Estimate Costs of Supply Optionsp. 8
The Results of the Analysis Should Be Interpreted with Cautionp. 10
Workforce Levels and Costs for the Shipyardsp. 11
What Size Design Workforce Is Least Costly for Different Yards and Workloads?p. 11
Stretching the Work Results in Further Savings; Splitting the Work Does Notp. 13
How Sensitive Are the Results to Variations in Assumed Parameters?p. 15
Sustaining the Skills of a Workforce in Excess of Demand Is Problematicp. 16
Critical Skills at the Shipyardsp. 17
Hundreds of Technical Skills Are Required to Design a Submarinep. 17
The Skills of a Sustained Workforce Might Follow Their Distribution for the Virginia-Class Designp. 18
But a Variety of Factors Should Be Taken into Accountp. 18
Suppliersp. 21
How Will Suppliers to the Shipyards Weather the Design Gap?p. 21
Some Suppliers Might Not Be Able to Offer Continued Supportp. 23
Options Addressing Supplier Risk Need to Be Tailored to the Vendorp. 24
Effect of a Design Gap on Navy Resourcesp. 25
The Navy Holds Key Design Rolesp. 25
Navy Design Activities Are Carried Out Mainly by the Naval Sea Systems Command and the Warfare Centersp. 26
NAVSEA Would Not Lose Personnel but Could Lose Some Expertisep. 27
The Warfare Centers Need at Least $30 Million per Year to Keep from Losing Skilled Design Professionalsp. 27
Conclusions and Recommendationsp. 31
Table of Contents provided by Blackwell. All Rights Reserved.

Supplemental Materials

What is included with this book?

The New copy of this book will include any supplemental materials advertised. Please check the title of the book to determine if it should include any access cards, study guides, lab manuals, CDs, etc.

The Used, Rental and eBook copies of this book are not guaranteed to include any supplemental materials. Typically, only the book itself is included. This is true even if the title states it includes any access cards, study guides, lab manuals, CDs, etc.

Rewards Program