Acquisition and Competition Strategy for the DD The U.S. Navy's 21st Century Destroyer

by
  • ISBN13:

    9780833038708

  • ISBN10:

    0833038702

  • Format: Paperback
  • Copyright: 2006-01-15
  • Publisher: RAND Corporation
  • Purchase Benefits
List Price: $22.50

Summary

How can the Navy achieve the most effe tive competition among its supplers during development and production of its new family of destroyers while ensuring that two shipyards reamin in business to compete on future programs?

Table of Contents

Preface iii
Figures ix
Tables xi
Summary xiii
Acknowledgments xxi
Abbreviations xxiii
A Note on Terminology xxv
CHAPTER ONE Introduction 1(14)
Program Overview
4(5)
Issues for Phase IV
9(3)
Research Strategy
10(1)
Examining the Appropriate Use of Competition Throughout Phase IV
10(1)
Evaluating Ways to Sustain the Industrial Base
11(1)
Exploring Contracting Strategies for Phase IV
12(1)
Organization of the Report
12(3)
CHAPTER TWO Applications of Competition in Phase IV 15(16)
Defense Acquisitions: Not Business as Usual
15(2)
Use of Competition in Phase IV of the DD(X) Program
17(1)
A Matrix of Options for Competition in Phase IV
18(13)
Should Detail Design of the Warfare System Be Competed?
19(2)
Should Production of the Warfare System Be Competed?
21(2)
Should Ship System Production Be Competed?
23(3)
Should Ship System Detail Design Be Competed?
26(5)
CHAPTER THREE Effects of the DD(X) Production Program on the Shipbuilding Industry 31(16)
Analysis Approach
31(5)
Sources of Input Data for the Model
36(3)
DD(X) Descriptive Data
36(1)
Data Provided by the Shipyards
37(2)
Analysis Results: Base Case
39(2)
Labor Demand
39(1)
Labor Supply
39(2)
Labor Cost
41(1)
Analysis Results: Alternative Cases
41(2)
Lead Ship to BIW
42(1)
Alternative Case: One-Year Delay in Start of Ship Production
42(1)
Alternative Case: One-Year Delay and Lead Ship at BIW
43(1)
Alternative Workload Cases
43(1)
Summary Observations
44(3)
Implications of Different Production Schedules
44(1)
Effects of Alternative Workload Allocations
45(2)
CHAPTER FOUR DD(X) Phase IV Contracting Issues and Options 47(12)
Model 1: Separate Contracts to Each Major Participant
49(2)
Model 2: Single Contract with One Commercial Entity
51(3)
Model 3: A Blend of Strategies
54(2)
Summary Observations
56(3)
CHAPTER FIVE Conclusions 59(6)
CHAPTER SIX Epilogue: July 2005 65(8)
The Plan Approaching Milestone B
65(2)
The Forcing Function—Number of Ships to Be Procured
67(1)
A New Strategy
68(2)
The Congressional Response
70(1)
The Proposed Compromise
70(3)
APPENDIX
A. DDG 51—Class Case Study
73(28)
B. Competition Effects in Recent Shipbuilding Programs
101(10)
C. Questionnaire for Shipbuilders
111(24)
Bibliography 135

Supplemental Materials

What is included with this book?

The New copy of this book will include any supplemental materials advertised. Please check the title of the book to determine if it should include any access cards, study guides, lab manuals, CDs, etc.

The Used, Rental and eBook copies of this book are not guaranteed to include any supplemental materials. Typically, only the book itself is included. This is true even if the title states it includes any access cards, study guides, lab manuals, CDs, etc.

Rewards Program