Note: Supplemental materials are not guaranteed with Rental or Used book purchases.
Purchase Benefits
PREFACE
PART I: INTRODUCTION TO ESTIMATING
1: The Art of Estimating
2: Overview of the Estimating and Bidding Process>
3: Introduction to Excel
PART II: THE QUANTITY TAKEOFF
4: Fundamentals of the Quantity Takeoff
5: Concrete
6: Masonry
7: Metals
8: Woods, Plastics, and Composites
9: Thermal and Moisture Protection
10: Openings
11: Finishes
12: Fire Suppression
13: Plumbing
14: HVAC
15: Electrical
16: Earthwork
17: Exterior Improvements
18: Utilities
PART III: PUTTING COSTS TO THE ESTIMATE
19: Material Pricing
20: Labor Productivity and Hours
21: Labor Rates
22: Equipment Costs
23: Crew Rates
24: Subcontract Pricing
25: Markups
26: Pricing Extensions
27: Avoiding Errors in Estimates
PART IV: FINALIZING THE BID
28: Submitting the Bid
29: Project Buyout
30: The Estimate as the Basis of the Schedule
31: Ethics
PART V: ADVANCED ESTIMATING WITH EXCEL
32: Converting Existing Forms
33: Creating New Forms
34: Proposals and Beyond
Appendix A: Review of Estimating Math
Appendix B: Sample Job Cost Codes
Appendix C: Sample Labor Productivity Rates
Appendix D: Model Scopes of Work
Appendix E: Glossary
Appendix F: Index of Drawing Sets
The New copy of this book will include any supplemental materials advertised. Please check the title of the book to determine if it should include any access cards, study guides, lab manuals, CDs, etc.
The Used, Rental and eBook copies of this book are not guaranteed to include any supplemental materials. Typically, only the book itself is included. This is true even if the title states it includes any access cards, study guides, lab manuals, CDs, etc.