did-you-know? rent-now

Amazon no longer offers textbook rentals. We do!

did-you-know? rent-now

Amazon no longer offers textbook rentals. We do!

We're the #1 textbook rental company. Let us show you why.

9780833047755

Controlling the Cost of C4I Upgrades on Naval Ships

by ; ; ; ;
  • ISBN13:

    9780833047755

  • ISBN10:

    0833047752

  • Format: Paperback
  • Copyright: 2009-11-16
  • Publisher: RAND Corporation
  • Purchase Benefits
  • Free Shipping Icon Free Shipping On Orders Over $35!
    Your order must be $35 or more to qualify for free economy shipping. Bulk sales, PO's, Marketplace items, eBooks and apparel do not qualify for this offer.
  • eCampus.com Logo Get Rewarded for Ordering Your Textbooks! Enroll Now
List Price: $25.00

Summary

Command, control, communications, computers, and intelligence (C4I) systems-the lifeblood of naval ships-have evolved at a rapid pace over the last few decades. To keep up with technological advances and to take advantage of improvements nurtured in the civilian marketplace, the U.S. Navy extensively uses commercial hardware and software for its C4I systems. However, the cost of keeping these products up-to-date is high.

Table of Contents

Prefacep. iii
Figuresp. ix
Tablesp. xi
Summaryp. xiii
Acknowledgmentsp. xxvii
Abbreviationsp. xxix
Introductionp. 1
The Problem: Controlling and Reducing the Costs of C4I Upgradesp. 1
Research Objectives and Approachp. 2
Organization of the Reportp. 4
Background on Navy C4I Systemsp. 5
Sea Power 21 and FORCEnetp. 5
Responsibility for C4Ip. 6
Navy C4I Systemsp. 7
C2 Systemsp. 8
Networks and Communication Systemsp. 11
C4I Upgrades and In-Service and New-Construction Timelinesp. 14
C4I Upgrades: Issues and Optionsp. 17
C4I-Upgrade Issues During Ship Design and Constructionp. 17
Adapting Commercially Available Systems and Technologies to Shipboard Environmentsp. 18
Deciding on GFE Versus CFE Systemsp. 20
Ensuring the Currency of C4I Systems at Deliveryp. 21
Incorporating Adequate Design Marginsp. 23
C4I-Upgrade Issues for In-service Shipsp. 24
Various Ship Configurations Make the Planning of Upgrades Difficultp. 24
Navigating the SHIPMAIN Processp. 26
C4I System Upgrade Issues Common to New-Ship Construction and In-Service Shipsp. 27
Integration and Testingp. 28
Hot Work and Changes to Ship Servicesp. 29
Topside Integrationp. 31
Summaryp. 31
Analysis of C4I Installation Costsp. 35
Methodologyp. 36
Cost Normalizationp. 39
Analytic Approachp. 39
C4I System Upgrade Display a High Degree of Installation-Cost Variabilityp. 40
Factors That Influence Installation-Labor Costsp. 42
Influence of Ship Type on Installation-Labor Costp. 42
Variations Within Ship Typep. 47
Cost Improvement Occurred with Some of the Upgradesp. 51
CANES Early Adoptersp. 54
Estimate Accuracyp. 56
Analysis by Hull Typep. 60
Analysis by Upgrade Typep. 63
Summary of Observationsp. 65
Conclusions and Recommendationsp. 67
Designing and Building Ships to Reduce C4I-Upgrade Costsp. 68
Managing Ship Programs to Reduce C4I-Upgrade Costsp. 69
Steps to Address the Variability in Upgrade Costsp. 70
The Impact of Ship Type, Ship Age, and Installation Locationp. 71
Reducing Costs for Successive Installationsp. 72
Accuracy in Estimating Installation-Labor Costsp. 72
Appendixes
Programs Managed by PEO C4Ip. 73
Descriptions of Analyzed Upgradesp. 89
Bibliographyp. 103
Table of Contents provided by Ingram. All Rights Reserved.

Supplemental Materials

What is included with this book?

The New copy of this book will include any supplemental materials advertised. Please check the title of the book to determine if it should include any access cards, study guides, lab manuals, CDs, etc.

The Used, Rental and eBook copies of this book are not guaranteed to include any supplemental materials. Typically, only the book itself is included. This is true even if the title states it includes any access cards, study guides, lab manuals, CDs, etc.

Rewards Program