did-you-know? rent-now

Amazon no longer offers textbook rentals. We do!

did-you-know? rent-now

Amazon no longer offers textbook rentals. We do!

We're the #1 textbook rental company. Let us show you why.

9780833041968

F-22A Multiyear Procurement Program: An Assessment of Cost Savings

by ; ; ; ;
  • ISBN13:

    9780833041968

  • ISBN10:

    0833041967

  • Format: Paperback
  • Copyright: 2007-09-24
  • Publisher: RAND Corporation
  • Purchase Benefits
  • Free Shipping Icon Free Shipping On Orders Over $35!
    Your order must be $35 or more to qualify for free economy shipping. Bulk sales, PO's, Marketplace items, eBooks and apparel do not qualify for this offer.
  • eCampus.com Logo Get Rewarded for Ordering Your Textbooks! Enroll Now
List Price: $25.50

Summary

Congress asked RAND for an independent review of whether the estimated savings from proposed multi-year contracts for 60 F-22A aircraft over three years would yield the promised savings. Researchers found that a multi-year procurement of three lots of F-22A fighters would save an estimated $411 million-about 4.5 percent of the total contract value-and that savings attributed to the multi-year contract by the contractors appear to be reasonable.

Table of Contents

Preface
Dedication
Figures
Tables
Summary
Acknowledgments
Abbreviations
Introductionp. 1
Backgroundp. 1
Purpose of This Reportp. 3
Research Approachp. 3
How We Went About This Researchp. 4
Organization of Reportp. 7
The Basics of Multiyear Contractsp. 9
Multiyear Contract Requirementsp. 9
Criteria for Using Multiyear Productionp. 10
Basic Components of the F-22A Contractp. 11
F-22A Program Content Not Included in the Multiyear Contractp. 13
Funding for Productionp. 13
Cost Reduction Initiativesp. 15
Program Accelerationp. 16
Multiyear Contract Modifications Possiblep. 16
Stability in F-22A Configuration Is Paramount During the MYP Contractp. 17
Estimating Single-Year Procurement Pricep. 19
Introductionp. 19
Scope of the Estimatep. 20
Estimating Approachp. 21
Data Sourcesp. 21
Level of Detailp. 23
Forecasting Methodp. 24
Other Adjustmentsp. 27
Price Model Structurep. 29
Resultsp. 32
Summaryp. 34
Categorization and Substantiation of F-22A Multiyear Contractor-Proposed Savingsp. 35
Evaluation of the Proposed Savings Initiativesp. 35
Quantitative Factors in Multiyear Contractsp. 38
Qualitative Factorsp. 43
Areas Where Little Of No Savings Occur Under MYPp. 45
Summaryp. 45
A Look at the History of Aircraft Multiyear Contractsp. 47
Introductionp. 47
Varying Key Program Attributes of Historical MYP Contractsp. 49
Validation of Claimed Savingsp. 49
Military Fixed-Wing MYP Contracts, 1982-1995p. 53
Military Fixed-Wing MYP Contracts Since 1995p. 57
Observations on the High-Level Historical Overview of MYP Savingsp. 62
Summary Conclusionsp. 75
Results and Findingsp. 77
Calculation of the Savings Percentagep. 78
After-the-Fact Analysis of F/A-18E/F Multiyear Savingsp. 81
Reasons for Multiyear Savings from Previous Reportsp. 93
Tail-Up Analysisp. 101
Institute for Defense Analyses Report Summaryp. 105
Military Fixed-Wing MYP Since 1995p. 111
Referencesp. 135
Table of Contents provided by Blackwell. All Rights Reserved.

Supplemental Materials

What is included with this book?

The New copy of this book will include any supplemental materials advertised. Please check the title of the book to determine if it should include any access cards, study guides, lab manuals, CDs, etc.

The Used, Rental and eBook copies of this book are not guaranteed to include any supplemental materials. Typically, only the book itself is included. This is true even if the title states it includes any access cards, study guides, lab manuals, CDs, etc.

Rewards Program