did-you-know? rent-now

Amazon no longer offers textbook rentals. We do!

did-you-know? rent-now

Amazon no longer offers textbook rentals. We do!

We're the #1 textbook rental company. Let us show you why.

9781563272127

Fast Track to Waste-Free Manufacturing

by
  • ISBN13:

    9781563272127

  • ISBN10:

    1563272121

  • Format: Hardcover
  • Copyright: 1999-03-19
  • Publisher: Productivity Pr

Note: Supplemental materials are not guaranteed with Rental or Used book purchases.

Purchase Benefits

  • Free Shipping Icon Free Shipping On Orders Over $35!
    Your order must be $35 or more to qualify for free economy shipping. Bulk sales, PO's, Marketplace items, eBooks and apparel do not qualify for this offer.
  • eCampus.com Logo Get Rewarded for Ordering Your Textbooks! Enroll Now
List Price: $68.95 Save up to $30.59
  • Rent Book $43.44
    Add to Cart Free Shipping Icon Free Shipping

    TERM
    PRICE
    DUE
    USUALLY SHIPS IN 3-5 BUSINESS DAYS
    *This item is part of an exclusive publisher rental program and requires an additional convenience fee. This fee will be reflected in the shopping cart.

Supplemental Materials

What is included with this book?

Summary

In Fast Track to Waste-Free Manufacturing: Straight Talk from a Plant Manager, John Davis details a new and proven system called Waste-Free Manufacturing (WFM) that rapidly deploys the lean process. This book will give you step-by-step directions for making rapid, lasting changes. Davis has created and linked four new drivers (workplace organization, uninterrupted flow, error-free process, and insignificant changeover) of WFM and details what order to do them in and when to move on to the next driver. He covers nearly every aspect of the lean revolution and provides the essential tools and techniques you will need to implement WFM. He also addresses the critical management issues that will arise in any plant that is striving to be world class. Drawing from more than 30 years of manufacturing experience, John Davis gives you tools and techniques for eliminating waste. WFM is not a theory. It is a proven process, and one the author has successfully implemented. Davis fully details the journey of a factory that moved from mass to waste-free manufacturing in a matter of 24 months. Wall Street analysts recognized this factory as an effective manufacturing model. You will learn how to rapidly deploy WFM and change the system of production. Filled with checklists, an ongoing case study, and, most importantly, strategies that will work, Fast Track to Waste-Free Manufacturing: Straight Talk from a Plant Manager will provide you with the principles and methodology for WFM.

Table of Contents

Publisher's Message xiii(4)
Acknowledgments xvii(2)
Preface xix
Introduction: The Revolution Has Just Begun 1(6)
Chapter 1: Confronting the Deep Dark Dungeon
7(16)
World Class Culture Shock
8(2)
Changing the Lifestyle of a Factory
10(4)
Where Are Our Manufacturing Leaders?
11(3)
The Old-Fashioned Production Meeting
14(9)
What's Wrong with This Picture?
19(4)
Chapter 2: The Plant Manager's Manifesto
23(16)
The Need to Energize for Change
23(3)
The Critical Need for Renewed Focus by Today's Plant Managers
26(3)
The Challenging Journey from Mass to Waste-Free Manufacturing
29(4)
Overcoming the Conventional Cost of Doing Business
32(1)
How Strong Is Your Sense of Urgency?
33(2)
The Fundamentals of Manufacturing Leadership
35(4)
Chapter 3: The New Competition and the Old Barriers
39(22)
Month One, Day One-A New Assignment
40(4)
Old Barriers to Deploying Waste-Free Manufacturing
44(3)
The Legend of the Loaves
47(6)
Finding the Damaging Mental Barriers
51(2)
Month One, Day Eight-Getting a Clearer Picture
53(2)
Steps to Overcoming Old Barriers
55(6)
Who the Heck Is Management?
57(4)
Chapter 4: Waste-Free Manufacturing-Changing the Rules
61(28)
Four Key Drivers for Waste-Free Manufacturing
63(3)
Driver One: Workplace Organization
63(1)
Driver Two: Uninterrupted Flow
63(1)
Driver Three: Error-Free Processing
64(1)
Driver Four: Insignificant Changeover
65(1)
Some Very Important Differences between WFM and TPS
66(1)
Tool Boxes to Support the Four Key Drivers
67(5)
Steps and Levels For 6C
68(2)
Pull Zones Rather Than Supermarkets
70(2)
Month Seven-Not So World Class
72(2)
Where to Begin-Understanding the Hidden Wastes
74(5)
The Connection between Hidden Wastes and World Class Manufacturing
76(3)
The Need for Never-Ending Improvement
79(2)
Becoming Knowledgeable in the Lean Tools and Techniques
80(1)
The Ultimate Challenge Facing U.S. Manufacturers
81(3)
Month Nine-The Awakening
84(5)
Chapter 5: Examining the WFM Drivers
89(44)
Month Twelve-Learning the Truth
89(6)
Seeing a Better Way to a Apply TPS
93(2)
Driver One: Workplace Organization (WPO)
95(12)
How to Begin Implementing WPO
96(2)
Establishing a Disposition Zone
98(1)
Implementing 6C
99(2)
Achieving WPO Through Staircasing 6C
101(3)
An Imaginary Tour of a Fully Deployed WFM
104(2)
Carrying the Momentum of WPO into the Office Arena
106(1)
WPO as the Foundation for Continuous Improvement
106(1)
Linking the Four WFM Drivers
107(5)
Shock Treatment Is Not Lasting Treatment
108(3)
There Is No Such Thing as a Perfect Factory
111(1)
Driver Two: Uninterrupted Flow
112(12)
The First U-Flow Effort-Pick the Low-Hanging Fruit
114(2)
How to Implement U-Flow
116(2)
Aggressive Pursuit of Point-of-Use Manufacturing Applications
118(4)
How Management Should Deal with Team Recommendations
122(2)
Driver Three: Error-Free Processing
124(2)
Driver Four: Insignificant Changeover
126(2)
When Is Setup and Changeover Deemed Insignificant?
126(2)
Getting Started with Insignificant Changeover
128(1)
A Second Look at Pull Zones
128(5)
Chapter 6: Beginning the WFM Journey
133(28)
The WFM Journey Is a Never-Ending Process
134(9)
The Will to Change and the Pain Threshold
135(3)
Old Habits Don't Die Easily
138(1)
Takt Time-Producing to the Beat
139(4)
Ten-Step Road Map for the Rapid Deployment of WFM
143(9)
Step One: Educating the Management Staff
145(1)
Step Two: Implementing Workplace Organization
145(2)
Step Three: Establishing the Promotion Office
147(1)
Step Four: Deciding on Your Core Processes
148(1)
Step Five: Making Decisions Based on WFM Principles
149(1)
Step Six: Moving Equipment to Point-of-Use
150(1)
Step Seven: Transferring Inventory to Point-of-Use
150(1)
Step Eight: Limiting Parts Production
150(1)
Step Nine: Instituting Product Cell Management
151(1)
Step Ten: Linking the Four WFM Drivers
152(1)
Your Greatest Warriors Against Waste-Industrial Engineers
152(1)
Simulating the Road Map to Deploy WFM
152(3)
Month Fourteen-The Power of Why
155(6)
The Why Technique
157(4)
Chapter 7: Changing the Culture
161(32)
The Production Worker Is the Center of Value-Added
162(4)
The Rules of the Game Have Changed for the Professional Ranks
163(1)
Obsolete Best Business Practices of the Past
164(2)
Making the Union a Partner in Change
166(7)
Building an Interface with the Union-Some Words of Advice
170(3)
Month Fifteen-Storm Cloud Brewing
173(4)
Work with Rather Than Deal with the Union
176(1)
Institutionalizing Owner-Operators
177(2)
Championing a Cause for the People
178(1)
Month Eighteen-A Heated Issue
179(3)
Using the Compressed Production System to Rapidly Deploy WFM
182(4)
The Foundation of the Compressed Production System
184(2)
Month Nineteen-Revitalizing the Morning Meeting
186(3)
The One-Level Organization
189(4)
Chapter 8: Measuring Progress-What to Measure and How
193(26)
Ten Key Areas of Measurement
195(8)
Measurement One: Completeness of Production Processes
197(2)
Measurement Two: Yield That Is Defect and Error Free
199(1)
Measurement Three: Time Spent on Setup and Changeover
200(1)
Measurement Four: Skillfulness in the Work Force
200(1)
Measurement Five: Mistake-Proof Processes
200(1)
Measurement Six: Mixed-Model Capability
201(1)
Measurement Seven: Waste Elimination Activities
201(1)
Measurement Eight: Elimination of Capital Expenditures
202(1)
Measurement Nine: Part Travel Distance
202(1)
Measurement Ten: Speed to Market for Product Enhancements
203(1)
Other Important Measurements
203(6)
Performance to Takt Time
203(1)
Inventory Expressed in Pieces Rather Than Dollars
204(1)
Suppliers Certified for Delivery to Point-of-Use
205(1)
Number of Value-Added Suggestions and Percent Implemented
206(1)
Non-Value-Added-Essential Versus Nonessential
206(1)
Number of Repeat Visits to Equipment or Processing
207(1)
Extent of Management Team Located on the Shop Floor
207(1)
Value-Added versus Non-Value-Added Floor Space Utilization
208(1)
Total Square Footage of Manufacturing Space per Product Family
208(1)
Knowing What and When to Measure
209(2)
Employee Reactions to Implementing New Measures
209(2)
Month Twenty-Making Both Steady Progress and Strong Enemies
211(8)
Give No Quarter and Take No Prisoners but Defuse Negative Perceptions
214(5)
Chapter 9: Organizational and Operational Issues to Support WFM
219(16)
Launching the Compressed Production System
219(2)
The Traditional Production Control Department
220(1)
Eliminating the Traditional Quality Control Department
220(1)
Analyzing Other Support Functions Under WFM
220(1)
Month Twenty-One-Selecting a Champion for the Process
221(5)
Establishing New Functions in the Compressed Production System
226(1)
Applying WFM in the Office Environment
227(2)
How to Use Displaced Production Employees
229(6)
Chapter 10: Staying the Course on Your Never-Ending Journey
235(30)
A Race with No Finish Line
236(1)
Month Twenty-Two-Gaining National Recognition
237(2)
The Continuous Improvement Pyramid
239(5)
Layer One-Establish and Fully Maintain WPO
241(1)
Layer Two-Study and Analyze the Current Process
241(1)
Layer Three-Plan and Lay out the New Process
242(1)
Layer Four: Prove the New Process
243(1)
Layer Five-Apply Visual Controls
243(1)
Understanding the Rocks and Boulders to Deployment
244(8)
Other Potential Boulders
246(2)
Fifteen-Point Checklist to Determine If You Are Globally Competitive
248(4)
You Need the Will to Just Do It!
252(3)
The Formula for Leading Effective Change
255(3)
Six Common Paradigms in the Professional Ranks That Can Block Change
258(2)
Month Thirty-Four-New and Grand Opportunities
260(1)
WFM in the Automotive Industry
261(1)
A Closing Comment on Your WFM Journey
262(3)
Bibliography 265(2)
About the Author 267(2)
Index 269

Supplemental Materials

What is included with this book?

The New copy of this book will include any supplemental materials advertised. Please check the title of the book to determine if it should include any access cards, study guides, lab manuals, CDs, etc.

The Used, Rental and eBook copies of this book are not guaranteed to include any supplemental materials. Typically, only the book itself is included. This is true even if the title states it includes any access cards, study guides, lab manuals, CDs, etc.

Rewards Program