rent-now

Rent More, Save More! Use code: ECRENTAL

5% off 1 book, 7% off 2 books, 10% off 3+ books

9781563273230

Integrating Kanban with MRP II: Automating a Pull System for Enhanced JIT Inventory Management

by
  • ISBN13:

    9781563273230

  • ISBN10:

    1563273233

  • Format: Paperback
  • Copyright: 2005-02-28
  • Publisher: Productivity Pr
  • Purchase Benefits
List Price: $59.95 Save up to $21.01
  • Digital
    $38.94*
    Add to Cart

    DURATION
    PRICE
    *To support the delivery of the digital material to you, a digital delivery fee of $3.99 will be charged on each digital item.

Summary

This book describes an automated kanban system that integrates MRPII, kanban bar codes, and a simple version of electronic data interchange into a powerful system that substantially lowers inventory levels and significantly eliminates non-value-adding actions.

Table of Contents

Publisher's Messagep. xiii
Prefacep. xvii
Acknowledgmentsp. xxiii
Eliminating Replenishment System Wastep. 1
Replenishment System Review-Non-Value-Added Activitiesp. 2
Push System Versus Pull Systemp. 3
Manufacturing Resource Planning (MRPII)p. 5
Order Point Systemp. 9
Manual Kanbanp. 10
Automated Kanban System-Waste Eliminationp. 12
Replenishment System Basicsp. 15
MRPII Overviewp. 16
Master Production Schedule Modulep. 16
Material Requirements Planning Modulep. 17
Shop Scheduling Modulep. 19
Capacity Requirements Planning Modulep. 19
Order Point System Overviewp. 20
Manual Kanban System Overviewp. 21
Internal Move Cardp. 22
Production Cardp. 22
Supplier Cardp. 25
Broadcastp. 25
Load-Smoothing and Sequencingp. 25
Manual Kanban System-Kanban Calculationp. 28
Production Card Calculation for Nonflexible Work Cellsp. 29
Determining Lead Time for a Nonflexible Work Cellp. 30
Nonflexible Work-Cell Production-Card Calculationp. 33
Flexible Work-Cell Production-Card Calculationp. 34
Internal Move Card Calculationp. 35
Supplier Card Calculationp. 37
Automated Kanban-The Automated Flow Technologyp. 43
Automated Flow Technologyp. 44
Calculating Kanban Lot Sizesp. 44
Creating Purchase Orders and Performing Download Upon Consumptionp. 45
Creating and Displaying Triggered Manufacturing Orders Upon Consumptionp. 49
Performing Receiptsp. 53
Calculating Flexible Work-Cell Staffingp. 53
Automated Flow Technology Programmingp. 56
Kanban Calculation/Simulation Program (KCSP)p. 56
KCSP Programmingp. 57
Cell-Staffing Calculation Programming (CSCP)p. 59
MRPII Enhancementsp. 60
Lead-Time Definitions for the AFT Systemp. 61
Supplier Lead Timep. 61
Purchasing Replenishment Lead Timep. 62
Manufacturing Lead Timep. 63
Manufacturing Replenishment Lead Timep. 63
Kanban Lot Size Versus Kanban Order Quantityp. 64
Kanban Order Policy Codep. 64
Supplier Download Capabilityp. 65
Kanban Prerequisites-WCM Techniquesp. 67
Reduce Manufacturing and Supplier Replenishment Lead Timesp. 68
Reduce Batch Sizesp. 71
Rectify Potential Obstacles That Can Impede Replenishment Performancep. 71
Kanban Prerequisitesp. 72
World Class Manufacturing Conversion Planp. 73
Just-in-Time Educationp. 75
Total Productive Maintenance (TPM) Programp. 77
Quick Changeover Programp. 79
Zero Quality Controlp. 81
Visual Workplacep. 83
Focused Factory/Work Cellsp. 84
Backflushing/Deduct Point Capabilityp. 86
Stockroom Eliminationp. 88
Performance Measurementp. 91
Container Selectionp. 91
Supplier Performance Rating and Supplier Contractsp. 95
Data Integrityp. 100
Prerequisites Completedp. 101
Implementing Kanbanp. 103
OEM Internal Kanban Implementationp. 103
Begin Implementing Kanban at Final Assemblyp. 104
Impact of Nonlinear Demand Patternsp. 104
Selecting Specific Part Numbers for Kanbanp. 106
How to Handle Common Componentsp. 108
Perform Cycle-Countingp. 109
Applying Safety Stockp. 109
Track the Inventory Levelsp. 110
OEM Kanban Procedures and Trainingp. 111
Key Processes to Monitor During the OEM's Internal Implementationp. 112
Implementing Kanban with Your Supplier Basep. 112
Supplier Performance Ratingsp. 113
Suppliers That Should Not Be Placed on Kanbanp. 113
Selecting Specific Part Numbers for Kanbanp. 113
Supplier's Involvement in the Selection of Containersp. 114
OEM as a Resourcep. 114
Key Processes to Monitor During the Supplier Implementationp. 115
Speed of Overall Kanban Implementationp. 115
Kanban and MRPII System Integrationp. 117
AFT Key Computer Fields and Their Functionsp. 117
Key Files Required by the AFT Systemp. 134
Simplified Version of EDIp. 136
Before Programming the AFT Systemp. 137
AFT Calculations for Determining Kanban Lot Sizes and Staffing Levelsp. 139
Determining Kanban Lot Sizes with AFTp. 140
Gross Requirementsp. 140
Kanban Lot-Size Formulap. 141
Formula Modifierp. 141
Kanban Lot-Size Calculation Stepsp. 142
KCSP Simulation Routinep. 148
Formula Modifier Settingp. 157
Determining Flexible Work-Cell Staffing Levels by Using CSCPp. 159
Perpetuation of the Automated Kanban Systemp. 161
Supplier One-Line-per-Item MRP Reportp. 162
Gross Requirements Reportp. 164
Net Requirements Reportp. 164
Planned Order Release Reportp. 167
Supplier Kanban Trigger Reportp. 167
Manufacturing Queue Screenp. 170
Purchasing and Manufacturing Shortage Reportsp. 173
Flexible Work-Cell Staffing Reprtp. 175
Add/Subtract Multiple Container Reportp. 176
Adjust Kanban Report for Single Containerp. 177
Trigger Kanban Report for Dual/Triple-Container Optionp. 177
Adjust Kanban Report for Dual/Triple-Container Optionp. 180
Purchasing Kanban Due Reportp. 180
Supplier Performance Rating Reportp. 182
Key Topics of the Automated Kanban Systemp. 185
Managing the Transportation Costp. 185
Mistake-Proof the AFT Triggering Capabilityp. 186
Non-Work-Cell Kanban Itemsp. 187
Reacting to Customer Demand Versus Producing to a Frozen Schedulep. 188
Standard Product Finished Goods/Allocation Methodologyp. 188
Nonlinear Customer Demandp. 189
Imbalance of Inventoryp. 190
High Degree of Commonalityp. 190
Broadcast Applicationp. 191
Short Receipt Policyp. 192
Frequency of Kanban Recalculationp. 193
Impact of Not Lot-Sizing MRPp. 193
Automated Kanban System Design Process-General Guidelinep. 194
Three Examples of AFT Implementationp. 199
North Starp. 199
Precision Tape Backupp. 205
Medical Monitoringp. 209
Conclusionp. 212
Indexp. 213
About the Authorp. 219
Table of Contents provided by Ingram. All Rights Reserved.

Supplemental Materials

What is included with this book?

The New copy of this book will include any supplemental materials advertised. Please check the title of the book to determine if it should include any access cards, study guides, lab manuals, CDs, etc.

The Used, Rental and eBook copies of this book are not guaranteed to include any supplemental materials. Typically, only the book itself is included. This is true even if the title states it includes any access cards, study guides, lab manuals, CDs, etc.

Rewards Program