rent-now

Rent More, Save More! Use code: ECRENTAL

5% off 1 book, 7% off 2 books, 10% off 3+ books

9781563271823

Integrating Kanban With Mrpii

by
  • ISBN13:

    9781563271823

  • ISBN10:

    1563271826

  • Format: Hardcover
  • Copyright: 1997-09-01
  • Publisher: Productivity Pr
  • Purchase Benefits
  • Free Shipping Icon Free Shipping On Orders Over $35!
    Your order must be $35 or more to qualify for free economy shipping. Bulk sales, PO's, Marketplace items, eBooks and apparel do not qualify for this offer.
  • eCampus.com Logo Get Rewarded for Ordering Your Textbooks! Enroll Now
List Price: $45.00

Summary

If you manage inventory, you probably use MRPII. MRPII has exceptional planning capabilities, but it is riddled with non-value-added activities. Manual kanban is a system designed to control a JIT environment. Compared to MRPII, it lowers inventory and minimizes shortages. But the manual process of recalculating part numbers by hand is time-consuming. This book describes an automated kanban system that integrates MRPII, kanban, bar codes, and a simple version of electronic data interchange into a breakthrough system that substantially lowers inventory and significantly eliminates non-value-adding activities.

Table of Contents

Publisher's Message xiii(4)
Preface xvii(6)
Acknowledgments xxiii
CHAPTER 1. Eliminating Replenishment System Waste
1(14)
Replenishment System Review--Non-Value-Added Activities
2(10)
Push System Versus Pull System
3(2)
Manufacturing Resource Planning (MRPII)
5(4)
Order Point System
9(1)
Manual Kanban
10(2)
Automated Kanban System -- Waste Elimination
12(3)
CHAPTER 2. Replenishment System Basics
15(28)
MRPII Overview
16(4)
Master Production Schedule Module
16(1)
Material Requirements Planning Module
17(2)
Shop Scheduling Module
19(1)
Capacity Requirements Planning Module
19(1)
Order Point System Overview
20(1)
Manual Kanban System Overview
21(7)
Internal Move Card
22(1)
Production Card
22(3)
Supplier Card
25(1)
Broadcast
25(1)
Load-Smoothing and Sequencing
25(3)
Manual Kanban System--Kanban Calculation
28(15)
Production Card Calculation for Nonflexible Work Cells
29(1)
Determining Lead Time for a Nonflexible Work Cell
30(3)
Nonflexible Work-Cell Production-Card Calculation
33(1)
Flexible Work-Cell Production-Card Calculation
34(1)
Internal Move Card Calculation
35(2)
Supplier Card Calculation
37(6)
CHAPTER 3. Automated Kanban -- The Automated Flow Technology
43(24)
Automated Flow Technology
44(12)
Calculating Kanban Lot Sizes
44(1)
Creating Purchase Orders and Performing Download Upon Consumption
45(4)
Creating and Displaying Triggered Manufacturing Orders Upon Consumption
49(4)
Performing Receipts
53(1)
Calculating Flexible Work-Cell Staffing
53(3)
Automated Flow Technology Programming
56(5)
Kanban Calculation/Simulation Program (KCSP)
56(1)
KCSP Programming
57(2)
Cell-Staffing Calculation Programming (CSCP)
59(1)
MRPII Enhancements
60(1)
Lead-Time Definitions for the AFT System
61(3)
Supplier Lead Time
61(1)
Purchasing Replenishment Lead Time
62(1)
Manufacturing Lead Time
63(1)
Manufacturing Replenishment Lead Time
63(1)
Kanban Lot Size Versus Kanban Order Quantity
64(1)
Kanban Order Policy Code
64(1)
Supplier Download Capability
65(2)
CHAPTER 4. Kanban Prerequisites--WCM Techniques
67(36)
Objective One: Reduce Manufacturing and Supplier Replenishment Lead Times
68(3)
Objective Two: Reduce Batch Sizes
71(1)
Objective Three: Rectify Potential Obstacles That Can Impede Replenishment Performance
71(1)
Kanban Prerequisites
72(29)
World Class Manufacturing Conversion Plan
73(2)
Just-in-Time Education
75(2)
Total Productive Maintenance (TPM) Program
77(2)
Quick Changeover Program
79(2)
Zero Quality Control
81(2)
Visual Workplace
83(1)
Focused Factory/Work Cells
84(2)
Backflushing/Deduct Point Capability
86(2)
Stockroom Elimination
88(3)
Performance Measurement
91(1)
Container Selection
91(4)
Supplier Performance Rating and Supplier Contracts
95(5)
Data Integrity
100(1)
Prerequisites Completed
101(2)
CHAPTER 5. Implementing Kanban
103(14)
OEM Internal Kanban Implementation
103(9)
Begin Implementing Kanban at Final Assembly
104(1)
Impact of Nonlinear Demand Patterns
104(2)
Selecting Specific Part Numbers for Kanban
106(2)
How to Handle Common Components
108(1)
Perform Cycle-Counting
109(1)
Applying Safety Stock
109(1)
Track the Inventory Levels
110(1)
OEM Kanban Procedures and Training
111(1)
Key Processes to Monitor During the OEM's Internal Implementation
112(1)
Implementing Kanban with Your Supplier Base
112(3)
Supplier Performance Ratings
113(1)
Suppliers That Should Not Be Placed on Kanban
113(1)
Selecting Specific Part Numbers for Kanban
113(1)
Supplier's Involvement in the Selection of Containers
114(1)
OEM as a Resource
114(1)
Key Processes to Monitor During the Supplier Implementation
115(1)
Speed of Overall Kanban Implementation
115(2)
CHAPTER 6. Kanban and MRPII System Integration
117(22)
AFT Key Computer Fields and Their Functions
117(17)
Key Files Required by the AFT System
134(3)
Simplified Version of EDI
136(1)
Before Programming the AFT System
137(2)
CHAPTER 7. AFT Calculations for Determining Kanban Lot Sizes and Staffing Levels
139(22)
Determining Kanban Lot Sizes with AFT
140(19)
Gross Requirements
140(1)
Kanban Lot-Size Formula
141(1)
Formula Modifier
141(1)
Kanban Lot-Size Calculation Steps
142(6)
KCSP Simulation Routine
148(9)
Formula Modifier Setting
157(2)
Determining Flexible Work-Cell Staffing Levels by Using CSCP
159(2)
CHAPTER 8. Perpetuation of the Automated Kanban System
161(24)
Supplier One-Line-per-Item MRP Report
162(5)
Gross Requirements Report
164(1)
Net Requirements Report
164(3)
Planned Order Release Report
167(1)
Supplier Kanban Trigger Report
167(3)
Manufacturing Queue Screen
170(3)
Purchasing and Manufacturing Shortage Reports
173(2)
Flexible Work-Cell Staffing Report
175(1)
Add/Subtract Multiple Container Report
176(1)
Adjust Kanban Report for Single Container
177(1)
Trigger Kanban Report for Dual/Triple-Container Option
177(3)
Adjust Kanban Report for Dual/Triple-Container Option
180(1)
Purchasing Kanban Due Report
180(2)
Supplier Performance Rating Report
182(3)
CHAPTER 9. Key Topics of the Automated Kanban System
185(14)
Managing the Transportation Cost
185(1)
Mistake-Proof the AFT Triggering Capability
186(1)
Non-Work-Cell Kanban Items
187(1)
Reacting to Customer Demand Versus Producing to a Frozen Schedule
188(1)
Standard Product Finished Goods/Allocation Methodology
188(1)
Nonlinear Customer Demand
189(1)
Imbalance of Inventory
190(1)
High Degree of Commonality
190(1)
Broadcast Application
191(1)
Short Receipt Policy
192(1)
Frequency of Kanban Recalculation
193(1)
Impact of Not Lot-Sizing MRP
193(1)
Automated Kanban System Design Process--General Guideline
194(5)
CHAPTER 10. Three Examples of AFT Implementation
199(14)
North Star
199(6)
Precision Tape Backup
205(4)
Medical Monitoring
209(3)
Conclusion
212(1)
About the Author 213(2)
Index 215

Supplemental Materials

What is included with this book?

The New copy of this book will include any supplemental materials advertised. Please check the title of the book to determine if it should include any access cards, study guides, lab manuals, CDs, etc.

The Used, Rental and eBook copies of this book are not guaranteed to include any supplemental materials. Typically, only the book itself is included. This is true even if the title states it includes any access cards, study guides, lab manuals, CDs, etc.

Rewards Program