Introduction | p. 1 |
Supply Chains and Production Planning | p. 1 |
Optimization | p. 2 |
Components of Supply Chain Management | p. 4 |
Scope of this Book | p. 5 |
Optimization Modeling | p. 7 |
Abstraction | p. 7 |
Symbols | p. 9 |
Variables, Data, Subscripts, and Math | p. 9 |
Sets | p. 11 |
Objective Functions and Constraints | p. 11 |
Finding Solutions | p. 14 |
Data | p. 15 |
A Few Words About Uncertainty | p. 15 |
Solvers and Model Structure | p. 16 |
Implementing the Models in this Book | p. 17 |
Starting with an mrp Model | p. 19 |
An Example | p. 19 |
mrp Mechanics | p. 20 |
mrp Data | p. 22 |
mrp Optimization Formulation | p. 24 |
Discussion of mrp | p. 26 |
Troubles | p. 27 |
Virtues | p. 29 |
Extending to an MRP II Model | p. 31 |
MRP II Mechanics | p. 31 |
MRP II Data and Constraints | p. 34 |
Discussion of MRP II | p. 36 |
Changeover Modeling Considerations | p. 38 |
A Straightforward Modification | p. 38 |
Production that Spans Time Buckets | p. 39 |
Parallel Machines | p. 40 |
Sequence Dependent Changeovers | p. 41 |
A Few Remarks About Changeovers | p. 42 |
A Better Model | p. 45 |
A Cost Based Objective Function | p. 45 |
Costs | p. 45 |
Objective Function | p. 47 |
Overtime and Extra Capacity | p. 49 |
A Simple Model | p. 49 |
Complications | p. 50 |
Allowing Tardiness | p. 51 |
A Simple Model | p. 52 |
Complications | p. 53 |
Objective Function Issues | p. 54 |
The Model | p. 55 |
Extensions to the Model | p. 59 |
Substitutes, Multiple Routings and Subcontractors | p. 59 |
Penalizing Changes to the Plan | p. 62 |
End-of-horizon Effects and Minimum Inventories | p. 64 |
Modeling Product Movement and Transport | p. 66 |
Simple Product Movement and Shipping | p. 67 |
Expedited Shipping | p. 67 |
Fixed Costs and Consolidations | p. 67 |
Transportation Discounts | p. 69 |
Discussion of Transportation Modeling | p. 70 |
Summarizing the Model | p. 70 |
Aggregation and Consolidation | p. 71 |
Consolidating Resources | p. 73 |
Aggregating Parts | p. 74 |
Discussion of Disaggregation | p. 79 |
Implementation Examples | p. 81 |
AMPL | p. 84 |
mrp Model | p. 86 |
mrp Data | p. 87 |
Results of Running mrp | p. 88 |
MRPII Model | p. 89 |
Data for MRPII | p. 90 |
SCPc Model | p. 91 |
Data for SCPc | p. 94 |
GAMS | p. 96 |
mrp and MRPII Models | p. 98 |
SCPc Model | p. 101 |
Maximal MPL | p. 106 |
mrp Model | p. 107 |
MRPII | p. 109 |
SCPc | p. 110 |
OPL | p. 114 |
mrp | p. 115 |
MRPII | p. 118 |
SCPc | p. 118 |
Xpress-Mosel | p. 123 |
mrp Model | p. 125 |
mrp Data | p. 128 |
mrp Results | p. 129 |
MRPII Model | p. 129 |
SCPc Model | p. 130 |
Solutions | p. 135 |
MIPs and Relaxations | p. 135 |
Branch and Bound | p. 138 |
Special Variable Types | p. 141 |
Semi-continuous Variables | p. 141 |
General Integer Variables | p. 142 |
Special Ordered Sets | p. 143 |
Heuristic Search Methods | p. 145 |
A Brief Primer on Heuristics | p. 146 |
Abstract Formulation and Solution Representation | p. 147 |
Example of an Embedded Problem | p. 149 |
Neighborhoods and Evaluation Functions | p. 150 |
Simulated Annealing | p. 154 |
Tabu Search | p. 156 |
Genetic and Evolutionary Algorithms | p. 157 |
Constraint Programming | p. 160 |
Some Stochastic Extensions | p. 163 |
Lead Times and Congestion | p. 164 |
The Issues | p. 165 |
Load Dependent Lead Times | p. 167 |
Solver Issues | p. 170 |
Example | p. 172 |
Complications and Discussion | p. 173 |
Scenarios | p. 174 |
The Issues | p. 175 |
A Multi-stage Probabilistic Model With Recourse | p. 178 |
Progressive Hedging | p. 180 |
A PH based Heuristic for SCPc | p. 184 |
Research Directions and References | p. 187 |
Supply Chain Management | p. 187 |
The Evolution of Logistics | p. 188 |
Closed Loop Supply Chains and Reverse Logistics | p. 191 |
The Importance of Information Technology | p. 191 |
Supply Contracts | p. 198 |
mrp, MRP II and Beyond | p. 200 |
The Early Steps | p. 200 |
Supply Chain Planning | p. 201 |
Production Planning and Scheduling | p. 202 |
Lot Sizing Models | p. 202 |
Planning and Inventory Control | p. 208 |
Machine Scheduling | p. 211 |
Aggregation and Part Families | p. 212 |
Load Dependent Lead Times | p. 214 |
Transportation | p. 219 |
Optimization | p. 223 |
Exact Methods | p. 225 |
Heuristic Search Methods | p. 225 |
Progressive Hedging | p. 229 |
Simulation | p. 230 |
Modeling | p. 231 |
Bibliography | p. 233 |
Index | p. 253 |
Table of Contents provided by Ingram. All Rights Reserved. |
The New copy of this book will include any supplemental materials advertised. Please check the title of the book to determine if it should include any access cards, study guides, lab manuals, CDs, etc.
The Used, Rental and eBook copies of this book are not guaranteed to include any supplemental materials. Typically, only the book itself is included. This is true even if the title states it includes any access cards, study guides, lab manuals, CDs, etc.