Note: Supplemental materials are not guaranteed with Rental or Used book purchases.
Purchase Benefits
Looking to rent a book? Rent Process-Based Software Project Management [ISBN: 9781420013528] for the semester, quarter, and short term or search our site for other textbooks by F. Alan Goodman. Renting a textbook can save you up to 90% from the cost of buying.
Essence of Software Project Management | |
The Software Project Management Big Picture | |
Introduction | |
Pre-Execution Efforts for Government Contractors | |
Pre-Execution Efforts for Commercial Companies | |
Execution Efforts for Both | |
Planning and Tracking: The Big Picture | |
Introduction | |
Proposal-Time Planning | |
The Software Project Schedule | |
The Project Management Plan (PMP) Document | |
Planning the Software Project | |
Traditional Conversion of Planning Packages to Work Packages | |
Tracking the Software Project | |
Process Framework Architecture | |
Process Overview | |
Introduction | |
The Software Process Framework Model Overview | |
Life-Cycle Mapping | |
Introduction | |
Life-Cycle Web Representation | |
Life Cycle/Schedule Connection | |
Life-Cycle/Event-Driven Procedure Connection | |
The Process Activity | |
Introduction | |
Activity Implementation | |
Special Process Activities for Software Project Management | |
Introduction | |
SCM Actions | |
Accounting Actions | |
Engineering Development Actions | |
SPM Actions | |
Institutionalization Considerations | |
Process Framework Model Institutionalized | |
Introduction | |
Process Repository Institutionalized | |
Script Programming Institutionalized | |
Inspection Procedure Institutionalized | |
Inspection Checklists Institutionalized | |
Activity Estimations Institutionalized | |
Work Breakdown Structure and Charge Numbers Institutionalized | |
Introduction | |
WBS Institutionalized | |
Charge Number Institutionalized | |
Software Project Management Role Partners Institutionalized | |
Introduction | |
Engineering Role Partner Institutionalized | |
Accounting Role Partner Institutionalized | |
SCM Role Partner Institutionalized | |
SPM Role Partner Institutionalized | |
SQA Role Partner Institutionalized | |
Pre-Execution Segment | |
Preprosal | |
Introduction | |
Using the Process for Pre-Execution Direction | |
Proposal | |
Introduction | |
Proposal Repository | |
Requirements | |
Other Considerations | |
Execution Segment | |
Project Setup | |
Introduction | |
Process Basis | |
Repositories | |
Charge Numbers | |
Planning Schedule | |
Planning up to Design | |
Introduction | |
Contract Schedule Items Planning | |
Target-System Schedule Items Planning | |
Planning After Design | |
Introduction | |
Planning "Design Down (System)" | |
Planning "Design Down (Subsystem A)" | |
Planning "Update Integration Plan (Subsystem A)" | |
Planning "Design Down (Subsystem B)" | |
Planning "Update Integration Plan (Subsystem B)" | |
Other Planning Considerations | |
Project Tracking | |
Introduction | |
Planning Packages | |
Activity Tracking | |
SCM-Based Tracking | |
Rework Tracking | |
Project Closedown | |
Introduction | |
Repositories on Closedown | |
Metrics Collection on Closedown | |
Postmortem on Closedown | |
Table of Contents provided by Publisher. All Rights Reserved. |
The New copy of this book will include any supplemental materials advertised. Please check the title of the book to determine if it should include any access cards, study guides, lab manuals, CDs, etc.
The Used, Rental and eBook copies of this book are not guaranteed to include any supplemental materials. Typically, only the book itself is included. This is true even if the title states it includes any access cards, study guides, lab manuals, CDs, etc.