Note: Supplemental materials are not guaranteed with Rental or Used book purchases.
Purchase Benefits
Looking to rent a book? Rent Project Management of Complex and Embedded Systems [ISBN: 9781420072068] for the semester, quarter, and short term or search our site for other textbooks by Kim H. Pries; Jon M. Quigley. Renting a textbook can save you up to 90% from the cost of buying.
Projects and Project Managers | |
Delivery | |
Overview of Program/Project Management | |
Need for this Book | |
Comparison of Approaches | |
Automotive Industry Action Group | |
Department of Defense | |
Institute of Electrical and Electronics Engineers | |
Electronics Industry Association | |
Process Management Areas | |
Staged-Gate Methods in General | |
What is a Gate? | |
Reasons for Gate Reviews | |
Objectives | |
Gate Targets | |
Importance of Gate Targets Selection | |
Measurement of Targets (Statistics) | |
Example of a Phased Project | |
Project Management | |
People | |
Limited Resource | |
Project Manager's role | |
Organization and Integration | |
Customer Focus | |
Brainstorming | |
Technical Solutions | |
Quality | |
Facilitate Team Creation | |
Conflict Resolution | |
Product Development Team Meetings | |
Program Management | |
Embedded Development | |
Product Integrity and Reliability | |
Product Integrity | |
System-Level Testing | |
Reliability | |
Cost | |
Structure of Sections | |
Technical Tools | |
Delivery | |
Axioms of Program Management | |
Supplier Selection | |
Supplier Evaluation | |
Capability Maturity Model Integrated | |
Software Process Improvement and Capability dEtermination | |
Work Breakdown Structure | |
Resource Breakdown Structure | |
Project Estimating and Scheduling | |
Top Down Estimating | |
Bottom Up Estimating | |
Phased Estimating | |
Project Evaluation and Review Technique | |
CPM | |
Network Diagram in General | |
Constructive Cost Model II | |
Product Integrity and Reliability | |
Risk Management | |
Risk Taxonomy | |
Risk Methodology | |
Risk Quantification | |
Assessment of Product Risk | |
Simulation and Modeling | |
Verification | |
Validation | |
Stress Testing | |
Reliability Testing | |
Cost | |
Project Acceptance Criteria | |
Payback Period | |
Return on Investment (ROI) | |
IRR | |
Market Share | |
Project Cost Management | |
Earned Value Management | |
Budget Controls | |
Cost Performance Index | |
Schedule Performance Index | |
Cost Variance | |
Schedule Variance | |
Estimate at Completion | |
Estimate to Completion | |
Variance at Completion | |
Quality, Function, Deployment, and Cost Status | |
War Story | |
Human Resource | |
Systems Thinking | |
Project Manager Words | |
Concept | |
Concept Overview | |
Inception | |
Planning | |
Implementation | |
Regulation | |
Termination | |
Gate Targets - Past View | |
Gate Targets - Future View | |
Delivery | |
Work Descriptions | |
Project Charter | |
Statement of Work and Statement of Objectives | |
SOW Detail | |
Charters versus SOWs | |
Product Integrity and Reliability | |
Voice of the Customer | |
Quality Function Deployment | |
Requirements and Constraints matrix | |
Engineering Issues | |
Bills of Material (Engineering) | |
Change Management (Engineering) | |
Change Management (Project Management) | |
Material Specification | |
Engineering Specification | |
Customer Specification | |
Specification Reviews | |
Special Product Characteristics | |
Hardware Revision Levels | |
Production Issues | |
Bills of Material (Manufacturing) | |
Process Flow Diagram | |
Special Process Characteristics | |
Line Sequencing | |
Quality Issues | |
Quality Requirements | |
Reliability Requirements | |
Product Assurance Plan | |
Software Quality Assurance Plan | |
Cost | |
Request for Proposal | |
Contract Types (fixed, etc) | |
Pugh matrix - Concept selection | |
Crashing Program Definition | |
Program Definition Risk | |
Funding Risk | |
Reducing the Risk | |
Technical Risk Assessment | |
Reducing the Risk | |
Schedule Risk | |
Reducing the Risk | |
Management Support | |
War Story | |
Cutting Edge Components | |
Herding Cats | |
Product Development | |
Product Development Overview | |
Phase Objectives | |
Inception | |
Planning | |
Implementation | |
Regulation | |
Termination | |
Delivery | |
Crashing Product Development | |
Schedule Compression | |
Crashing Limitation | |
Crashing Risk | |
Fast Tracking | |
Fast Tracking Risk | |
Product Integrity and Reliability | |
Design Failure Mode and Effects Analysis (DFMEA) | |
Design For Manufacture and Assembly | |
Prototype Builds | |
Key Product Characteristics | |
Design Verification | |
Product Development Risk | |
Design Requirements Risk | |
Reducing the Risk | |
Design Policy Risk | |
Reducing the Risk | |
Design Process Risk | |
Reducing the Risk | |
Design Analysis | |
Reducing the Risk | |
Parts and Materials Selection | |
Reducing the Risk | |
Software Design | |
Reducing the Risk | |
Design Reviews | |
Reducing the Risk | |
Design Release | |
Reducing the Risk | |
Product Requirements Risk | |
New Equipment, Tooling, and Facility Requirements Gauges and Testing Equipment Requirements | |
Team Feasibility Commitment and Management Support | |
Cost | |
Request For Quote | |
Make or Buy Analysis | |
Value Analysis | |
What is Value Analysis? | |
Information Phase | |
Functional Analysis | |
Creative Phase | |
Judgment Phase | |
Development Phase | |
Recommendation Phase | |
Product Functional Decomposition | |
Value Analysis Integrated into Design Process | |
Outsourcing | |
Project Manager Involvement in Negotiations | |
Modular design | |
War Story | |
Production site | |
Material availability | |
Battery | |
Commitment | |
Process Development | |
Delivery | |
Process Development Overview | |
Phase Objectives | |
Initiate | |
Plan | |
Execute | |
Control | |
Closing | |
Product Integrity and Reliability | |
Process Flow | |
Ideal Process Flow | |
Less than Ideal Process Flow | |
Process Flow Under Control | |
PFMEA | |
Key Control Characteristics | |
PCP | |
Special Process Characteristics | |
Process Floor Plan | |
Process Flow Chart | |
Product and Process Quality System Review | |
Characteristics Matrix | |
Prelaunch Control Plan | |
Process Instructions | |
Measurement Systems Analysis Plan | |
Packaging Specifications and Standards | |
Corrugated Containers | |
Returnable Containers | |
Packing Slips | |
Preliminary Process Capability Study Plan | |
Crashing Process Development | |
Process Development Risk | |
Manufacturing Plan | |
Reducing the Risk | |
Quality Manufacturing Process | |
Reducing the Risk | |
Piece Part Control | |
Reducing the Risk | |
Supplier Control | |
Reducing the Risk | |
Defect Control | |
Reducing the Risk | |
Tool Planning | |
Reducing the Risk | |
Production Test Equipment | |
Reducing the Risk | |
Manufacturing Screening | |
Reducing the Risk | |
Process Capability | |
Cost | |
Cost and delivery performance | |
Modular design of process and equipment | |
Management Support | |
War Story | |
Validation of Product and Process | |
Delivery | |
Validation of Product and Process Overview | |
Phase Objectives | |
Initiate | |
Planning | |
Execute | |
Control | |
Closing | |
Product Integrity and Reliability | |
Design Verification Plan and Report | |
Verification versus Validation | |
Verification | |
Validation | |
Manufacturing Qualification | |
Electronic Data Interchange | |
Bench Testing versus Field Testing | |
Bench Testing | |
Final Product or Multievent Testing | |
Measurement Systems Evaluation | |
Preliminary Process Capability Study | |
Production Part Approval Process | |
Packaging Evaluation | |
Process Control Plan | |
Reduced Variation | |
Common Cause | |
Special Cause | |
Crashing Verification and Validation | |
Validation Risk | |
Built-In Test | |
Reducing the Risk | |
Cost | |
Outsourced | |
Simulation | |
War Story | |
Last Minute Material Failure | |
Component Qualification | |
Trust But Verify | |
PVT on Nonproduction Parts | |
Slow Testing Feedback | |
Errors Found in Production | |
Release to Production | |
Release to Production Overview | |
Phase Objectives | |
Inception | |
Planning | |
Implementation | |
Regulation | |
Termination | |
Delivery | |
Process Sign-Off | |
Trial Production Runs | |
Production Process Review | |
Process Verification Testing | |
First Time Capability | |
Quality Planning Sign-off | |
Pilot Runs | |
Goals | |
Objectives | |
Runs-at-Rate | |
Crashing Production Release | |
Methods Builds | |
Design Change Notification | |
Product Integrity and Reliability | |
Production Test Equipment | |
Production Release Risk | |
Service Parts | |
Reducing the Risk | |
Technical Documents | |
Reducing the Risk | |
Deviations | |
Cost | |
Delivery Performance | |
Design for Manufacture | |
Design for Assembly | |
War Story | |
Last Minute Material Failure | |
Failure Reporting and Corrective Action System (Phase) | |
Delivery | |
Importance of Failure Reporting, Analysis, and Corrective Action System | |
Initiate | |
Planning | |
Execute | |
Control | |
Closing | |
Product Integrity and Reliability | |
Risk | |
Failure Reporting System | |
Reducing the Risk | |
Cost | |
War Story | |
Unplug It | |
Product Support | |
Delivery | |
Project Management Responsibility | |
Handing off the Project | |
What Happens During launch | |
Crashing Product Support | |
Product Integrity and Reliability | |
Launch Containment | |
Cost | |
Extensibility | |
Emergency Shipment | |
War Story | |
Supplier/Customer relationship | |
Field Failure | |
Program Management | |
Program management versus Project Management Program Manager Skill Set | |
Final Thoughts | |
How Many Programs Work Concurrently? | |
Generalizing Automotive Techniques to Project Management | |
Future Trends | |
Globalization | |
Reduction in Force | |
Troubled Project | |
Project Manager Origins | |
"The Accidental Project Manager" | |
Technical Talent as Project Managers | |
Outsourcing Project Management | |
Importance of Lessons Learned | |
APPENDICES | |
The 18 PPAP Documents | |
System Requirements Review (SRR) | |
System Design Review (SDR) | |
Software Specification Review (SSR) | |
Software Quality Assurance Plan (SQAP) | |
Software and Hardware Reviews | |
Preliminary Design Review (PDR) | |
Critical Design Review (CDR) | |
Test Readiness Review (TRR) | |
Functional Configuration Audit (FCA) | |
Physical Configuration Audit (PCA) | |
Formal Qualification Review (FQR) | |
Production Readiness Review (PRR) | |
Embedded Development Overview | |
Process Sign-off | |
Software Metrics | |
Software Metrics | |
Project Metrics | |
IEEE-1220 Systems Engineering Master Plan Format | |
Release Notes | |
FMEA Basics | |
Bibliography | |
Index | |
Table of Contents provided by Publisher. All Rights Reserved. |
The New copy of this book will include any supplemental materials advertised. Please check the title of the book to determine if it should include any access cards, study guides, lab manuals, CDs, etc.
The Used, Rental and eBook copies of this book are not guaranteed to include any supplemental materials. Typically, only the book itself is included. This is true even if the title states it includes any access cards, study guides, lab manuals, CDs, etc.