did-you-know? rent-now

Amazon no longer offers textbook rentals. We do!

did-you-know? rent-now

Amazon no longer offers textbook rentals. We do!

We're the #1 textbook rental company. Let us show you why.

9780833037978

The United Kingdom's Nuclear Submarine Industrial Base Sustaining Design and Production Resources

by
  • ISBN13:

    9780833037978

  • ISBN10:

    0833037978

  • Format: Paperback
  • Copyright: 2005-07-26
  • Publisher: RAND Corporation
  • Purchase Benefits
List Price: $20.00

Summary

Recommends strategies to efficiently sustain and operate the United Kingdom's submarine industrial base.

Table of Contents

Preface iii
Figures
ix
Tables
xiii
Summary xv
Acknowledgements xxvii
Abbreviations xxix
Introduction
1(6)
Study Objectives and Research Approach
3(1)
The UK Submarine Industrial Base
4(3)
Maintaining Nuclear Submarine Design Resources
7(32)
Problems in Maintaining Resources
8(3)
Resources Required for a New Design Effort
11(7)
Timing the Design Resource Demands
18(6)
Sustaining a Design Core Between New Programmes
24(13)
Spiral Development of the Astute Class
25(2)
Continuous Conceptual Designs
27(1)
Design of Unmanned Undersea Vehicles
28(1)
Design of Diesel Submarines for Export
29(1)
Collaboration with the United States or Other Countries
30(5)
Collaboration Within the United Kingdom
35(2)
Summary
37(2)
Maintaining Nuclear Submarine Production Resources
39(34)
Importance of Continuous Production
40(2)
A Look at Future Programmes
42(3)
Timing of Production for the Next SSBN Class
45(3)
Fleet Size and Production Timing for the Remaining Astute-Class Submarines
48(12)
Workforce Demands at the Skill Level
56(1)
Labour Costs of Various Options
57(3)
Delaying the Start of Astute 4
60(3)
Implications of No Follow-On to the Vanguard Class
63(2)
Bridging the Gap in Submarine Production at Barrow
65(1)
Vitality of the Vendor Base
66(4)
Identification of Departed or Potentially Problematic Suppliers
67(1)
Discussion
68(2)
Summary
70(3)
Summary Findings and Recommendations
73(22)
Key Decisions to Sustain Nuclear Submarine Design Capability
73(5)
Decide If There Will Be a Next-Generation SSBN Class
73(1)
Decide on the Operational Life of the Vanguard Class
74(1)
Plan on Annual Investments to Sustain a Core of Design Resources
75(1)
Begin Talks with the United States on Collaborative Design Programmes
76(1)
Encourage Collaboration Between the Various Design Organisations
77(1)
Key Decisions to Sustain Nuclear Submarine Production Capability
78(3)
Decide on the Operational Life of the Vanguard Class
78(1)
Decide on Follow-On Astute-Class Production
79(1)
Take Actions to Support Nonnuclear Vendors
80(1)
APPENDIX
A Brief History of UK Submarine Production
81(10)
The Nuclear Submarine Design Process
91(4)
Bibliography 95

Supplemental Materials

What is included with this book?

The New copy of this book will include any supplemental materials advertised. Please check the title of the book to determine if it should include any access cards, study guides, lab manuals, CDs, etc.

The Used, Rental and eBook copies of this book are not guaranteed to include any supplemental materials. Typically, only the book itself is included. This is true even if the title states it includes any access cards, study guides, lab manuals, CDs, etc.

Rewards Program