Note: Supplemental materials are not guaranteed with Rental or Used book purchases.
Purchase Benefits
What is included with this book?
What Every Engineer Should Know: Series Statement | p. xv |
Preface | p. xvii |
Author | p. xix |
Acknowledgments | p. xx |
List of Abbreviations | p. xxi |
Development Processes | p. 1 |
Introduction | p. 1 |
Concept and Market | p. 5 |
People and Disciplines | p. 7 |
Architecting and Architecture | p. 8 |
Phases of a Project | p. 16 |
Scheduling | p. 19 |
Documentation | p. 21 |
Requirements and Standards | p. 24 |
Analysis | p. 30 |
Design Trade-Offs | p. 31 |
Tests | p. 38 |
Integration | p. 42 |
Manufacturing | p. 44 |
Support | p. 45 |
Disposal | p. 47 |
Liability | p. 48 |
Priorities | p. 49 |
Summary | p. 49 |
References | p. 50 |
Variations on the Theme-Considerations for Mission-Critical Equipment and Medical Devices | p. 53 |
Development Processes | p. 53 |
People and Disciplines | p. 55 |
Architecting and Architecture | p. 55 |
Phases | p. 61 |
Scheduling | p. 65 |
Documentation | p. 66 |
Requirements and Standards | p. 66 |
Analysis | p. 70 |
Design Trade-Offs | p. 75 |
Tests | p. 84 |
Integration | p. 86 |
Manufacturing | p. 90 |
Support | p. 90 |
Disposal | p. 93 |
Liability | p. 93 |
Priorities | p. 93 |
Summary | p. 94 |
References | p. 94 |
Tools of the Trade | p. 97 |
Introduction | p. 97 |
Tools for Estimation and Feasibility | p. 97 |
Tools for Project Control | p. 102 |
Tools for Design | p. 104 |
Laboratory Equipment | p. 106 |
References | p. 109 |
Case Study 1-Major Appliances | p. 111 |
Concept and Market | p. 111 |
People and Disciplines | p. 113 |
Architecting and Architecture | p. 113 |
Phases | p. 115 |
Scheduling | p. 115 |
Documentation | p. 115 |
Requirements and Standards | p. 116 |
Analysis | p. 116 |
Design Trade-Offs | p. 116 |
Tests | p. 119 |
Integration | p. 119 |
Manufacturing | p. 119 |
Support | p. 120 |
Disposal | p. 121 |
Liability | p. 121 |
Summary | p. 121 |
Acknowledgment | p. 121 |
Case Study 2-Telecom Products | p. 123 |
Concept and Market | p. 123 |
People and Disciplines | p. 125 |
Architecting and Architecture | p. 125 |
Phases | p. 127 |
Scheduling | p. 128 |
Documentation | p. 128 |
Requirements and Standards | p. 130 |
Analysis | p. 131 |
Design Trade-Offs | p. 131 |
Tests | p. 133 |
Integration | p. 134 |
Manufacturing | p. 135 |
Support | p. 137 |
Disposal | p. 138 |
Liability | p. 139 |
Summary | p. 139 |
Acknowledgments | p. 139 |
Case Study 3-Commercial Laboratory Equipment | p. 141 |
Concept and Market | p. 141 |
People and Disciplines | p. 143 |
Architecting and Architecture | p. 144 |
Phases | p. 147 |
Scheduling | p. 156 |
Documentation | p. 156 |
Requirements and Standards | p. 158 |
Analysis | p. 159 |
Design Trade-Offs | p. 160 |
Tests | p. 165 |
Integration | p. 166 |
Manufacturing | p. 166 |
Support | p. 168 |
Disposal | p. 168 |
Liability | p. 168 |
Summary | p. 169 |
Acknowledgment | p. 169 |
References | p. 169 |
Case Study 4-Automobile Engine Controller | p. 171 |
Concept and Market | p. 171 |
People and Disciplines | p. 173 |
Architecting and Architecture | p. 173 |
Phases | p. 176 |
Scheduling | p. 176 |
Documentation | p. 177 |
Requirements and Standards | p. 177 |
Analysis | p. 179 |
Design Trade-Offs | p. 179 |
Tests | p. 182 |
Integration | p. 183 |
Manufacturing | p. 183 |
Support | p. 184 |
Disposal | p. 185 |
Liability | p. 185 |
Summary | p. 187 |
Acknowledgments | p. 187 |
References | p. 188 |
Case Study 5-Industrial Flowmeter | p. 189 |
Concept and Market | p. 189 |
People and Disciplines | p. 190 |
Architecting and Architecture | p. 191 |
Phases | p. 192 |
Scheduling | p. 193 |
Documentation | p. 193 |
Requirements and Standards | p. 194 |
Analysis | p. 194 |
Design Trade-Offs | p. 194 |
Tests | p. 199 |
Integration | p. 199 |
Manufacturing | p. 199 |
Support | p. 200 |
Disposal | p. 201 |
Liability | p. 201 |
Summary | p. 202 |
Acknowledgment | p. 202 |
Case Study 6-Military Support Equipment | p. 203 |
Concept and Market | p. 203 |
People and Disciplines | p. 206 |
Architecting and Architecture | p. 207 |
Phases | p. 208 |
Scheduling | p. 210 |
Documentation | p. 210 |
Requirements and Standards | p. 211 |
Analysis | p. 211 |
Design Trade-Offs | p. 212 |
Tests | p. 215 |
Integration | p. 217 |
Manufacturing | p. 217 |
Support | p. 218 |
Disposal | p. 218 |
Liability | p. 218 |
Summary | p. 218 |
Acknowledgment | p. 219 |
Reference | p. 219 |
Case Study 7-Designing Instruments for Space Flight | p. 221 |
Concept and Market | p. 221 |
People and Disciplines | p. 222 |
Architecting and Architecture | p. 223 |
Phases | p. 224 |
Scheduling and Estimating | p. 229 |
Documentation | p. 230 |
Requirements and Standards | p. 235 |
Analysis | p. 236 |
Design Trade-Offs | p. 239 |
Tests | p. 244 |
Integration | p. 245 |
Manufacturing and Fabrication | p. 250 |
Support | p. 260 |
Disposal | p. 260 |
Liability | p. 261 |
Summary | p. 261 |
Acknowledgments | p. 261 |
References | p. 262 |
Case Study 8-Aerospace Video Processor | p. 263 |
Concept and Market | p. 263 |
People and Disciplines | p. 265 |
Architecting and Architecture | p. 265 |
Phases | p. 267 |
Scheduling | p. 269 |
Documentation | p. 269 |
Requirements and Standards | p. 271 |
Analysis | p. 272 |
Design Trade-Offs | p. 272 |
Tests | p. 274 |
Integration | p. 275 |
Manufacturing | p. 275 |
Support | p. 276 |
Disposal | p. 276 |
Liability | p. 276 |
Summary | p. 277 |
Acknowledgment | p. 277 |
Case Study 9-Satellite Subsystem | p. 279 |
Concept and Market | p. 279 |
People and Disciplines | p. 280 |
Architecting and Architecture | p. 281 |
Phases | p. 282 |
Scheduling and Estimating | p. 283 |
Documentation | p. 283 |
Requirements and Standards | p. 288 |
Analysis | p. 289 |
Design Trade-Offs | p. 289 |
Tests | p. 299 |
Integration | p. 299 |
Manufacturing and Fabrication | p. 300 |
Support | p. 300 |
Disposal | p. 300 |
Liability | p. 301 |
Summary | p. 301 |
Acknowledgments | p. 301 |
References | p. 301 |
Case Study 10-Programmer for Implanted Stimulators | p. 303 |
Concept and Market | p. 303 |
People and Disciplines | p. 306 |
Architecting and Architecture | p. 307 |
Phases | p. 309 |
Scheduling | p. 311 |
Documentation | p. 311 |
Requirements and Standards | p. 313 |
Analysis | p. 316 |
Design Trade-Offs | p. 323 |
Tests | p. 327 |
Integration | p. 328 |
Manufacturing | p. 328 |
Support | p. 329 |
Disposal | p. 329 |
Liability | p. 329 |
Summary | p. 330 |
References | p. 331 |
Case Study 11-Implanted Medical Devices | p. 333 |
Concept and Market | p. 333 |
People and Disciplines | p. 334 |
Architecting and Architecture | p. 338 |
Phases | p. 342 |
Scheduling | p. 349 |
Documentation | p. 349 |
Requirements and Standards | p. 354 |
Analysis | p. 359 |
Design Trade-Offs | p. 361 |
Tests | p. 367 |
Integration | p. 370 |
Manufacturing | p. 371 |
Support | p. 373 |
Disposal | p. 373 |
Liability | p. 374 |
Summary | p. 374 |
Acknowledgment | p. 375 |
References | p. 375 |
Summary Comparisons Across the 11 Case Studies | p. 377 |
Comparing the Case Studies | p. 377 |
Market | p. 378 |
People and Disciplines | p. 379 |
Architecting and Architecture | p. 380 |
Scheduling | p. 381 |
Documentation and Processes | p. 381 |
Requirements and Standards | p. 382 |
Analyses | p. 383 |
Design Trade-Offs | p. 383 |
Test and Integration | p. 390 |
Manufacturing | p. 390 |
Support and Service | p. 391 |
Liability | p. 392 |
Some Observations on Architectural Trade-Offs in Selected Real-Time Systems | p. 393 |
Some Thoughts | p. 393 |
Indicating System for a Parking Garage | p. 393 |
Data Acquisition System for Biological Monitoring | p. 404 |
Gun Fuzing System | p. 407 |
Summary | p. 411 |
References | p. 412 |
Some Observations about Consumer Appliances | p. 413 |
Concept and Market | p. 413 |
Product Teardown Summaries | p. 414 |
Coffeemaker Teardown | p. 414 |
Remote Control Teardown | p. 428 |
Hobbies, Arts, and Crafts | p. 432 |
Common Appliance Problems | p. 434 |
Summary | p. 435 |
References | p. 438 |
Some Observations about User Interfaces | p. 439 |
Why Are User Interfaces so Important? | p. 439 |
Basic Principles for User Interfaces | p. 439 |
Vending Machine faux pas | p. 441 |
Appliance Display faux pas | p. 442 |
Remote Control faux pas | p. 444 |
Boombox faux pas | p. 446 |
Handheld Chemical Agent Sensors | p. 446 |
Summary | p. 452 |
References | p. 453 |
Index | p. 455 |
Table of Contents provided by Ingram. All Rights Reserved. |
The New copy of this book will include any supplemental materials advertised. Please check the title of the book to determine if it should include any access cards, study guides, lab manuals, CDs, etc.
The Used, Rental and eBook copies of this book are not guaranteed to include any supplemental materials. Typically, only the book itself is included. This is true even if the title states it includes any access cards, study guides, lab manuals, CDs, etc.