did-you-know? rent-now

Amazon no longer offers textbook rentals. We do!

did-you-know? rent-now

Amazon no longer offers textbook rentals. We do!

We're the #1 textbook rental company. Let us show you why.

9780727733542

Bridge Management 5

by ;
  • ISBN13:

    9780727733542

  • ISBN10:

    0727733540

  • Format: Hardcover
  • Copyright: 2005-04-08
  • Publisher: Inst of Civil Engineers Pub

Note: Supplemental materials are not guaranteed with Rental or Used book purchases.

Purchase Benefits

  • Free Shipping Icon Free Shipping On Orders Over $35!
    Your order must be $35 or more to qualify for free economy shipping. Bulk sales, PO's, Marketplace items, eBooks and apparel do not qualify for this offer.
  • eCampus.com Logo Get Rewarded for Ordering Your Textbooks! Enroll Now
List Price: $282.66 Save up to $70.66
  • Buy Used
    $212.00
    Add to Cart Free Shipping Icon Free Shipping

    USUALLY SHIPS IN 2-4 BUSINESS DAYS

Supplemental Materials

What is included with this book?

Table of Contents

Designed-in maintenance features of the I-70 Mississippi River bridgep. 1
The UK Highways Agency's advice notes on the non-destructive testing of highway structuresp. 11
Paddington bridge project - risk managementp. 20
Corrosion assessment of bridge cablesp. 28
Development of bridge management systems (BMS) in Japan and USAp. 37
A case study on the evaluation of the hanger rope for the Namhae Suspension Bridgep. 44
The successful implementation of a defects-based bridge management system and adoption of bridge performance indicators for national roads in South Africap. 51
Replacement of the Kepplerbrucke in Rottenburg/Neckar, Germanyp. 59
Strain measurement of a space structure bridgep. 67
Widening the Huey P. Long Bridgep. 75
The structures management information system (SMIS) databasep. 83
Proposed remedial scheme for restoring load distribution action to a complex bridge deckp. 90
Strengthening box-girder bridges using external post-tensioningp. 97
Threading the needle - holistic solutions in an urban junction improvement, East Londonp. 105
Robustness of standard Swiss overpasses with V-columnsp. 113
The 3-dimensional behaviour of masonry archesp. 121
Recent developments in the inspection of railway bridgesp. 129
Old Wey Bridge refurbishmentp. 138
Industrial rope access approach in the inspection and maintenance management of bridgesp. 147
The replacement of worn pendel bearings for the A9 Kessock Bridge, Invernessp. 155
Comparison of bridge management practice in England and Francep. 163
Inspection, testing and monitoring of trunk road bridges in Englandp. 171
The Nienburg cable-stayed bridge collapse : an analysis eighteen decades laterp. 179
Modular frame concept cart for inspection of slab-on-girder bridge superstructurep. 187
A large scale demolition in a densely populated urban area - a case studyp. 195
Tay Road Bridge improvementsp. 203
Refurbishment of the old Medway Bridgep. 210
The use of embedded probes for monitoring reinforcement corrosion ratesp. 219
Guideline for the assessment of existing structuresp. 227
Bridge management based on multiple-objective optimizationp. 235
The development and implementation of a bridge management system for the provincial government of the Western Cape, South Africap. 243
A new assessment model for shear in reinforced concrete bridges with short anchorage lengthsp. 251
The Bhairab Bridge, Bangladesh - a case study of the planning, design and construction of a second crossing of the Meghna Riverp. 259
An asset management plan for a local authority bridge stockp. 267
Sensitivity of predicted bridge traffic load effects to the tails of truck weight distributionsp. 275
A14 Huntingdon Railway viaduct - half joint strengthening worksp. 283
A14 Huntingdon Railway viaduct re-grouting of post-tensioning tendon ductsp. 291
Case studies on the impact of overloading bridges in Chinap. 299
Arching action in concrete bridge deck slabs for increased durability and sustainabilityp. 306
Maintenance issues in the design of long-span cable-stayed bridgesp. 314
Application of an energy-dissipating sacrificial device (EDSD) for seismic performance improvement of girder bridgesp. 321
Sulphate induced deterioration of above ground components of highway structuresp. 330
BD91/04 a new departmental standard for new unreinforced masonry arch bridgesp. 338
Saving half through girder bridges using non-linear finite element analysisp. 345
Multi-objective optimization in a circumscribed bridge systemp. 353
Combining the construction period and service life structural monitoring requirements, resulting in a single cost effective solutionp. 361
The new French technical guide for aiding the management of structures damaged by concrete expansionp. 368
The maintenance and management strategy of bridges for local government in Japanp. 377
Environmental sustainability for bridge managementp. 385
System reliability for bridge evaluationp. 393
Target reliability for design and evaluation of bridgesp. 401
The management of post-tensioned bridges - the client's perspectivep. 409
Remaining fatigue life estimates for riveted railway bridgesp. 417
Bridge management using principles of whole life costing and life cycle assessment subject to uncertaintyp. 426
Maintenance prioritisation of highway structuresp. 433
Effectiveness of preventative maintenance for reinforced concrete bridges - a stochastic approachp. 443
The influence of speed on the dynamic amplification of two loads crossing a simply supported bridgep. 452
Some considerations on the performance analysis of concrete girders in Francep. 459
Probabilistic assessment of cable residual strengthp. 468
Modes of failure of multi-ring masonry arches under fatigue loadingp. 476
Effect of FRP and radial-pin reinforcement on the modes of failure and fatigue performance of multi-ring masonry archesp. 484
The behaviour of open spandrel masonry arch bridgesp. 492
Potentials of a knowledge-based system for bridge management optimisationp. 500
Experimental evaluation of the load bearing capacity of corroded beamsp. 508
New developments of the Italian bridge management systemp. 517
A review of bridge assessments on the UK motorway and trunk road networkp. 525
A technical review of BA79 'the management of sub-standard structures'p. 533
Prolonging bridge life through an innovative approach to de-icing operationsp. 541
Strengthening and repair of railway bridges using FRP compositesp. 549
A real-time bridge weigh-in-motion systemp. 557
Acoustic emission monitoring applications for civil structuresp. 563
System reliability-based bridge assessment using the response surface methodp. 571
Comparison of bridge management strategies using life-cycle cost analysisp. 578
Application of risk and reliability to the management of bridgesp. 587
Monitoring and identification of time dependent random variablesp. 594
Code of practice for the management of highway structuresp. 602
Performance measures for highway structuresp. 611
From the condition indicator to asset managementp. 620
Remote sensing techniques for bridge deck evaluationp. 628
Life extension of a 100-year old timber truss rail bridgep. 638
A fundamental study on the improvement and refurbishment of existing bridgesp. 647
Strengthening the strength and ductility of existing box columns built up with insufficient corner weldingp. 654
Management of suspension bridge cables - the US experiencep. 663
Table of Contents provided by Blackwell. All Rights Reserved.

Supplemental Materials

What is included with this book?

The New copy of this book will include any supplemental materials advertised. Please check the title of the book to determine if it should include any access cards, study guides, lab manuals, CDs, etc.

The Used, Rental and eBook copies of this book are not guaranteed to include any supplemental materials. Typically, only the book itself is included. This is true even if the title states it includes any access cards, study guides, lab manuals, CDs, etc.

Rewards Program